JUST drove through the "being rushed to finish b4 Christmas" roadworks outside the new school at Lake Cathie/Bonny Hills.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
For a week we have seen furious activity and suffered long waits as the project to get the one car-one kid army in and out each morning and afternoon was completed.
Who in their right mind, getting enormous salary, designed this monstrosity?
The only thing missing is a giant screwtop to go with the giant bottleneck that has been created.
With only a few cars at a time allowed a right turn from Bonny Hills side, expect a long line if you want to travel through. The same for southbound as those lined up to enter school grounds line back into the through lane.
Cannot understand, after the traffic craziness around each of the recently completed major projects in this district, how the designer cannot have been aware of how this one will turn out.
The explanation pre-construction was for a roundabout to alleviate expected traffic. Another round of grant applications I expect. Maybe in ten years. Thanks.
David A Bignell
Bonny Hills