Resealing of Oxley Highway at Yippin Creek on Saturday February 16

Motorists are advised of changed traffic conditions on Saturday on Oxley Highway for resealing work to be carried out west of Wauchope.

Work will be carried out at Yippin Creek from 7am to 6pm on Saturday 16 February, weather permitting.

Traffic control and a reduced speed limit of 40km/h will be in place for the safety of workers and motorists.

Motorists are advised to drive to the conditions, and follow the direction of signs and traffic control.

Roads and Maritime Services thanks motorists for their patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit www.livetraffic.com or call 132 701.

Comments